NEXTDC S4 Phase One Electrical Contract Awarded — How Can HV/LV, UPS, Generator and Busway Systems Be Coordinated?Using the NEXTDC S4 announcement, we examine critical coordination points for HV/LV, UPS, generators, busway and commissioning.
OpenAI Plans Up to 1,000 MW of Controllable Data Center Load in Georgia—What Does Safe Power Reduction Require?OpenAI's Georgia plan targets up to 1,000 MW of flexible load. Engineering guidance on UPS, controls, cooling, and recovery.
LS Electric to Supply 38 kV Switchgear for a Fuel Cell Data Center—New Protection Questions for On-Site Power GenerationLS Electric will supply 38 kV switchgear for a fuel cell data center, with a focus on protection, grounding, and restoration.
Pure DC Installs Final 75 MVA Transformer at LON01—What Should Be Checked Before Energization?Following Pure DC's LON01 milestone, we outline checks required before energizing a 75 MVA data center transformer.
The EU Has Proposed a New Data Centre Rating System—Which Metering and Audit Gaps Need to Be Identified?The EU proposal raises the importance of PUE and WUE data, submetering, and an auditable operating baseline.
Schneider Electric–Equinix pilot: what should be verified when deploying software-defined MV switchgear in a live data center?What to verify in the Schneider Electric–Equinix MV pilot: protection, firmware, cybersecurity, SAT, and rollback.
Vertiv to Acquire King Environmental Services—Raising the Importance of Liquid Cooling System Cleaning, Balancing, and Load TestingThe Vertiv–King deal highlights the importance of flushing, balancing, fluid quality control, and load testing in liquid cooling.
Schneider Electric Launches 2.5 MW Prefabricated Power Modules in Europe—What Should Be Checked Before On-Site Integration?What to verify before integrating and commissioning 2–2.5 MW prefabricated data center power modules, including SAT and IST.
STULZ Introduces New TelAir and WallAir Systems: What Should Be Checked When Replacing Cooling in Edge or Critical Infrastructure?What to check when replacing precision cooling in edge and critical rooms: capacity, redundancy, free cooling, controls and maintenance.
Siemens and Reinhausen to Develop a 36 kV-to-800 VDC Solid-State Transformer—New Protection and Maintenance Questions for Data CentersEngineering review of protection, redundancy and maintenance issues for a solid-state transformer converting 36 kV to 800 VDC.
GE Vernova Announces a Medium-Voltage UPS: When Is MV-Level Protection Justified Over LV UPS Blocks?How GE Vernova's medium-voltage UPS could affect data center selectivity, bypass design, maintenance, and critical power architecture.
ABB Unveils Ultracapacitor System to Support Ireland’s Data Center Grid Compliance—New Considerations for Critical Power DesignABB’s platform for Irish data centers combines ultracapacitor storage, grid-forming power electronics, and real-time control.