Active Equipment Commissioning – Construction & Retrofit

Commission New Equipment Without Interrupting Operations

Once your new or upgraded infrastructure is in place, we take care of commissioning your active equipment — servers, routers, standalone appliances, and AI nodes — with full power, cooling, and network alignment.

CONSTRUCTION & RETROFIT SERVICES

Retrofit Focus: Network Gear, AI Servers, Standalone Devices

We coordinate device installation, power-up sequencing, firmware configuration, and cable patching. Our technicians ensure every system goes online with zero downtime and full documentation.

01   Server and network hardware integration post-retrofit

After power and cooling systems are upgraded, hardware integration must follow with precision. We handle the physical and logical deployment of servers, switches, firewalls, and appliances — ensuring power alignment, network redundancy, and conformance to naming and addressing standards.

02   AI and GPU server commissioning with power/cooling validation

High-density compute hardware like AI accelerators demand specialized power and thermal validation. We provision these systems with rack-level power tuning, airflow calibration, and thermal load simulation — ensuring stable operation under peak performance conditions.

03   Standalone system testing and documentation

Legacy equipment is often poorly documented or loosely integrated. We validate standalone devices — from serial appliances to KVM switches — and generate configuration snapshots, connection diagrams, and test logs for every asset brought online.

04   Live cutover planning and risk mitigation

Swapping live infrastructure requires more than technical know-how — it demands orchestration. We create phased migration and cutover plans with rollback strategies, blackout windows, and rollback contingencies. Our approach ensures that critical workloads remain untouched while your infrastructure evolves beneath them.


Contact us

Ready to build or upgrade your data center with precision and scalability in mind?


Our expert design team is here to support you at every step — from space planning and rack systems to power, cooling, security, and equipment commissioning.
Contact us to create a tailored data center environment that meets your performance, energy, and uptime goals.

Are you also interested in our data center products and solutions?

Critical Power

With our platform, you’ll save time when you need it most. It’s the fastest way to meet your customers’ needs. 

READ MORE

Thermal Management

You’ll enjoy company growth faster than you expected possible, by streamlining services and features. 

READ MORE

Racks & Enclosures

Our support team is available every day to make sure that things runs smoothly. We’re here to help. 

READ MORE