Data Center Space Planning – Construction & Retrofit
Modernize Your Layout Strategy with Expert Planning
Whether expanding or repurposing an existing facility, our construction and retrofit space planning services reconfigure white space, secure zones, and supporting infrastructure to modern standards. We ensure optimal rack flow, cable pathways, and future expansion without interrupting current operations.
CONSTRUCTION & RETROFIT SERVICES
Retrofit Focus: White Space, Critical Zones, Pathways
Our retrofit approach is focused on optimizing functional areas — like UPS rooms, battery banks, and security sections — while accommodating operational continuity. We re-engineer pathways and rack zones to support increased density, airflow control, and compliance with Tier classifications.
01 Reconfiguration of white space and hot/cold aisles
Legacy data centers often suffer from inefficient airflow due to outdated aisle configurations. Our retrofit service strategically repositions racks and adjusts containment systems to re-establish thermal zones that support today’s high-density deployments. The goal is to reduce hot spots, enhance cooling efficiency, and extend equipment lifespan — all without interrupting existing operations.
02 Upgrade and zoning of UPS and battery rooms
We restructure outdated UPS and battery spaces to meet modern electrical and fire safety codes. This includes separating maintenance corridors, implementing environmental controls, and allocating future expansion zones — all while maintaining uninterrupted backup power availability during upgrades.
03 Pathway adjustments for airflow and cabling efficiency
Cabling congestion can block airflow and restrict service access. Our retrofit approach cleans up legacy pathways, installs dedicated raceways, and ensures proper clearance from cooling ducts and high-voltage lines. The result is a safer, cooler, and more maintainable environment.
04 Retrofitting office and security areas for better access
We redesign admin and control zones within the data center envelope to support clearer physical segregation and faster incident response. Retrofit includes secure vestibules, badge access controls, and reallocation of floor space for optimized operational flow.
Contact us
Ready to build or upgrade your data center with precision and scalability in mind?
Our expert design team is here to support you at every step — from space planning and rack systems to power, cooling, security, and equipment commissioning.
Contact us to create a tailored data center environment that meets your performance, energy, and uptime goals.
Are you also interested in our data center products and solutions?
Critical Power
With our platform, you’ll save time when you need it most. It’s the fastest way to meet your customers’ needs.
Thermal Management
You’ll enjoy company growth faster than you expected possible, by streamlining services and features.
Racks & Enclosures
Our support team is available every day to make sure that things runs smoothly. We’re here to help.