Data Center Rack Systems – Construction & Retrofit

Flexible Rack Deployment for Legacy and New Build Sites

Upgrading rack systems requires precise construction planning to avoid service disruption. We implement retrofit and new-build rack layouts optimized for equipment density, airflow, and scalable power integration.

CONSTRUCTION & RETROFIT SERVICES

Retrofit Focus: 4-Post, Network & Cold Aisle Containment

Our solutions include modern colocation cabinets, in-row containment upgrades, and restructured cable channels. We adapt layouts for existing raised floors and improve structural anchoring for seismic or high-density use cases.

01   Retrofit of legacy 4-post and network racks

Older rack formats often lack cable management and airflow containment. We retrofit outdated 4-post frames with fully enclosed cabinets, grounding systems, and vertical cable organizers — improving structural stability, thermal isolation, and compliance with modern deployment standards.

02   Cold aisle containment installation

Containment retrofits are essential for maximizing cooling efficiency in existing data halls. We design modular cold aisle containment structures that integrate with your current floor layout, fire suppression, and lighting systems — ensuring quick installation with no downtime.

03   Reorganization for cable management improvements

Spaghetti cabling is more than unsightly — it’s a maintenance and airflow hazard. We reorganize rack cabling using vertical managers, color-coded patching, and cable trays that separate copper and fiber. This retrofit simplifies troubleshooting and reduces signal interference.

04   Rack-level airflow and power integration upgrades

As compute density rises, legacy racks often lack airflow control and power redundancy. We retrofit blanking panels, side-to-side airflow kits, and dual-feed PDUs to support high-density deployments and N+1 resilience — all without disturbing active workloads.


Contact us

Ready to build or upgrade your data center with precision and scalability in mind?


Our expert design team is here to support you at every step — from space planning and rack systems to power, cooling, security, and equipment commissioning.
Contact us to create a tailored data center environment that meets your performance, energy, and uptime goals.

Are you also interested in our data center products and solutions?

Critical Power

With our platform, you’ll save time when you need it most. It’s the fastest way to meet your customers’ needs. 

READ MORE

Thermal Management

You’ll enjoy company growth faster than you expected possible, by streamlining services and features. 

READ MORE

Racks & Enclosures

Our support team is available every day to make sure that things runs smoothly. We’re here to help. 

READ MORE