Structured Cabling – Construction & Retrofit

Network Backbone Upgrades with Zero Downtime

We retrofit cabling infrastructure to support next-gen bandwidth, high port density, and organized labeling. Fiber backbones, copper patch panels, and MPO systems are installed in alignment with operational constraints.

CONSTRUCTION & RETROFIT SERVICES

Retrofit Focus: Optical Cabling, MPO, and Patch Panels

Our cabling design ensures separation from power paths, adherence to bend radius, and standards-compliant installation. Whether your buildout requires new fiber trays or retrofit of existing cabinets, we execute with precision and clarity.

01   MPO and fiber patching system retrofits

Legacy fiber trunks are hard to scale and manage. We upgrade to MPO/MTP systems with high-density patching and standardized polarity — increasing flexibility and minimizing physical footprint. All work includes end-to-end testing and certification.

02   Copper cabling upgrades (Cat6A and shielded)

We replace obsolete Cat5/5e lines with shielded Cat6A or higher-rated cabling to meet 10G and PoE++ demands. Installations follow proper bend radius, separation from EMI sources, and structured labeling for easier expansion and audit compliance.

03   Re-routing for compliance with power separation

Shared pathways for low-voltage and power cabling violate best practices. Our retrofit teams re-route cabling into dedicated raceways or tray systems that ensure proper separation, protect signal integrity, and reduce fire risk.

04   Labeling and documentation updates for legacy systems

Documentation gaps are common in older facilities. We perform on-site audits, relabel cabling endpoints, update rack elevations, and generate digital cable maps — enabling faster incident response and simplified capacity planning.


Contact us

Ready to build or upgrade your data center with precision and scalability in mind?


Our expert design team is here to support you at every step — from space planning and rack systems to power, cooling, security, and equipment commissioning.
Contact us to create a tailored data center environment that meets your performance, energy, and uptime goals.

Are you also interested in our data center products and solutions?

Critical Power

With our platform, you’ll save time when you need it most. It’s the fastest way to meet your customers’ needs. 

READ MORE

Thermal Management

You’ll enjoy company growth faster than you expected possible, by streamlining services and features. 

READ MORE

Racks & Enclosures

Our support team is available every day to make sure that things runs smoothly. We’re here to help. 

READ MORE