Data Center Power Systems – Construction & Retrofit

Modernize Your Power Distribution with Confidence

Upgrading your power infrastructure? We provide construction and retrofit services for UPS units, switchgear, PDUs, ATS modules, and backup generators — with Tier-level redundancy planning.

CONSTRUCTION & RETROFIT SERVICES

Retrofit Focus: PDUs, ATS, UPS and Switchgear

Our approach allows for phased electrical upgrades without halting operations. We coordinate cutovers, commission failover systems, and ensure N+1 resilience at every distribution level.

01   Redundant PDU installations

Older power chains often lack circuit diversity. We install A/B redundant rack PDUs with load monitoring and environmental sensors, supporting dual power paths and remote management — improving uptime and energy visibility.

02   UPS unit replacements and bypass design

Aging UPS systems are a single point of failure. We engineer phased UPS replacements using wrap-around bypasses or sidecar modules, maintaining runtime protection during swap-out and increasing battery autonomy and management capability.

03   ATS and RPP upgrades with load balancing

We modernize Automatic Transfer Switches (ATS) and Remote Power Panels (RPPs) to support multi-source feeds, generator failover, and real-time load shedding. All retrofits are load-balanced and monitored for fault isolation.

04   Switchgear enhancements and generator integration

Outdated switchgear can bottleneck power distribution. We replace or extend switchboards, breakers, and busways to accommodate higher loads. Generator retrofits are synchronized with utility feeds using modern ATS panels and load banks for live testing.


Contact us

Ready to build or upgrade your data center with precision and scalability in mind?


Our expert design team is here to support you at every step — from space planning and rack systems to power, cooling, security, and equipment commissioning.
Contact us to create a tailored data center environment that meets your performance, energy, and uptime goals.

Are you also interested in our data center products and solutions?

Critical Power

With our platform, you’ll save time when you need it most. It’s the fastest way to meet your customers’ needs. 

READ MORE

Thermal Management

You’ll enjoy company growth faster than you expected possible, by streamlining services and features. 

READ MORE

Racks & Enclosures

Our support team is available every day to make sure that things runs smoothly. We’re here to help. 

READ MORE