Data Center Physical Security – Construction & Retrofit
Security Infrastructure for Evolving Facility Needs
Security needs evolve with your infrastructure. Our construction and retrofit services strengthen your physical perimeter and internal protection zones with updated access control, intrusion detection, and surveillance technology.
CONSTRUCTION & RETROFIT SERVICES
Retrofit Focus: Access Control, Intrusion Alarms, Cameras
We install and integrate security solutions that comply with both local regulations and global standards. Whether you need to add biometric gates or modernize camera coverage, our approach enables modular upgrades with full system continuity.
01 Upgrade of access control infrastructure
We modernize physical security by integrating networked access controls, biometric systems, and time-based permissions. Retrofit work includes replacing outdated badge systems with scalable platforms that offer centralized control and audit logging.
02 Biometric gate installation and mantrap retrofits
To meet compliance and zero-trust policies, we retrofit mantraps with dual-factor authentication including biometrics. All construction is phased to preserve perimeter integrity and maintain facility access during the build.
03 Expansion of CCTV and remote monitoring systems
We upgrade analog CCTV systems to IP-based smart surveillance with real-time alerting, analytics, and remote access. Our retrofit includes cabling, PoE switching, and integration into existing NVRs or cloud platforms.
04 Intrusion detection and alarm modernization
Outdated intrusion sensors often fail to meet current sensitivity or zoning requirements. We retrofit detection systems with addressable sensors and integrate with fire and BMS platforms to enable full-facility awareness.
Contact us
Ready to build or upgrade your data center with precision and scalability in mind?
Our expert design team is here to support you at every step — from space planning and rack systems to power, cooling, security, and equipment commissioning.
Contact us to create a tailored data center environment that meets your performance, energy, and uptime goals.
Are you also interested in our data center products and solutions?
Critical Power
With our platform, you’ll save time when you need it most. It’s the fastest way to meet your customers’ needs.
Thermal Management
You’ll enjoy company growth faster than you expected possible, by streamlining services and features.
Racks & Enclosures
Our support team is available every day to make sure that things runs smoothly. We’re here to help.